Payback

Payback Analysis

A typical payback scenario illustrates the "total cost' advantage that Repowering has over other alternatives.

Situation

A petro-chemical company utilizes steam from a package boiler on a stand-by basis for process requirements. The boiler is cycled frequently and rapidly to fill the steam requirements. The existing boiler has a large amount of refractory, including tile, brick and mortar. This refractory has been a costly annual maintenance problem for the owner. It also insulates the furnace pressure parts, increasing the flame temperature of the burner, resulting in higher NOx emissions.

The owner/operator of the boiler is under pressure to reduce its maintenance-related costs, increase steam output to 150000 # / hr., and reduce its emissions without repermitting. Options under consideration include 1) a retube with a new burner with FGR (increased fan requirements for FGR necessitated a new fan), 2) a new boiler, and 3) package boiler Repowering.

Boiler Conditions Prior To Repowering

Boiler type: "D" type boiler

Contract date: 1969

Steam output: 150,000 # / hr. (rated)

1,35,000 (actual)

Fuel type : Natural gas

Furnace Construction

Front wall: Refractory brick wall

Floor: Refractory tiles over membrane wall tubes, 2" tubes on 4" centers

Side wall: Membrane wall, 2" tubes on 3" centers

Division wall: 2" tubes on 4" centers, studded wall design

Superheater

Type: Convective

Emissions

NOx : .2 lbs / MMBTU

CO : 300 to 500 ppm

VOC : 30 to 50 ppm

 

Flue gas recirculation : None

Fan : Replaced in 1984

Solution

The Repowering solution includes an ABCO furnace with no refractory on heat transfer surfaces, 100% membrane  waterwall furnace design, increased furnace volume (raising the drum centers & widening the furnace), and installing a Coen "QLN" burner. The old boiler and burner are replaced except for the steam and mud drums. The existing drums, fan, foundation and auxiliaries are incorporated into the new steam generation system. Emissions from the repowered boiler are guaranteed less than the following :

  • NOx : 40 ppm @ 3% O2
  • VOC : 15 ppm
  • CO : 150 ppm

The new emission level is guaranteed without FGR because of the engineered ABCO furnace modifications. No new emissions permitting is required since the cost of Repowering in this case is less than 50% of a new boiler system.



Request for Information / Request a Catalog from ABCO Industries, Inc.
 
 
 
To request more information from ABCO Industries, Inc., please complete the form below.
 
*Name:    
*Email:    
Company:    
*Type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.