architecture - engineering - construction
Advance Lifts
Advance Lifts Catalog
Advance Lifts - Technical And Accessories Information
Advance Lifts Catalog
TECHNICAL |
AND ACCESSORIES INFORMATION |
 |
| A. Where bridge width is the same as platform
width. |
 |
| B. Where bridge width is smaller than platform width. |
NOTES
A. Consult factory for pit diagram for optional wheel chock.
B. Reinforce concrete to suit local soil conditions.
C. All pit work and materials shown are the responsibility of
owner or his agent (by pit contractor).
D. Installer to run 1/2" diameter hose(s) through 3"
conduit from power unit to lift base.
E. Dimension tolerances are plus 1/4" minus 0"
(+1/4"-0").
F. 180 degree steel hinge bridges require a bridge recess length
equal to bridge length minus 2-3/4".
G. 180 degree aluminum hing bridges require a bridge recess length equal
to bridge length minus 3-3/4" and a pit length equal to platform length plus
7-1/2".
H. Consult factory for bridges longer than 30". (18" on
4000 Series).
Installation Bill of Materials
1. 3" x 3" x 1/4" curb angle as required.
2. One (1) 3" conduit from power unit location to pit.
3. One (1) Advance Model _______________.
4. One (1) electric disconnect switch for 5HP or 7-1/2 HP motor.
5. Ten (10) gallons Dextron III ATF hydraulic fluid.
6. One (1) 1/2" SAE 100R2 hydraulic pressure hose from power
unit location to lift base 1/2" male national pipe threads both ends (two
hoses required for 4000 Series).
7. Concrete anchor bolts and material for shimming and/or
grouting.
* Seller furnishes Advance Lift only unless otherwise agreed to in
writing.
Phone 800.843.3625 Fax 630.584.9405 Web
Site www.advancelifts.com
1999 Advance Lifts, Inc. All rights reserved.
|