Homepage  
Search
find:
search for:
   
 
Site Navigation
News / Publications
Jobs
Service
   Add this page to Google Bookmarks
   Add this page to Mister Wong
   Add this page to del.icio.us
 
   Alkco Lighting  Alkco Edge-GloŽ  

EDGE-GLOŽ - Page 2

 

 

INSTALLS IN
4 MINUTES

LESS THAN 1/3 THE TIME VS. COMPETITIVE SIGNS

Step 1
Using the housing as a template, cut a hole into the ceiling tile. Bend open the locking tabs on the bar-hanger with standard pliers.
Step 2
Set the ceiling tile and housing into the ceiling grid, and bend bar-hanger locking tabs closed over T-bar with standard pliers.
Step 3
Remove top access cover and attach to flexible conduit whip. Make electrical connections using supplied push-in quick connectors and re-install access cover.
 
Step 4
Install panel faceplate assembly by inserting torsion springs into retaining slots.
 

Operating Cost Comparison

Exit Sign

Input
Wattage

Annual Energy
Costs
($.10/KWH)

Lamp Life

Total
Maintenance
Costs
($10/lamp change
+cost of lamps)

Total Annual
Operating Costs

Typical Incandescent

26-40 watts

$22-35

1/3 year

$39

$61-74

1-lamp Fluorescent
Edge-Glo

9.3 watts

$8.15

1 year

$14

$22.15

2-lamp Fluorescent
Edge-Glo

18.5 watts

$16.20

1 year

$18

$34.20

Single-Panel
LED
Edge-Glo

3.3 watts

$2.89

25+ years

$0

$2.89

Double Panel
LED
Edge-Glo

5 watts

$4.38

25+years

$0

$4.38

 

Request for Information / Request a Catalog from Alkco Lighting
 
 
 
To request more information from Alkco Lighting, please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com