Homepage  
Search
find:
search for:
   
 
Site Navigation
News / Publications
Jobs
Service
   Add this page to Google Bookmarks
   Add this page to Mister Wong
   Add this page to del.icio.us
 
   Complete Dewatering  Complete Dewatering  

Complete Dewatering - Page 4

 

 

COMPLETE ALL PLASTIC WELL POINT SYSTEM...

Assembles and Disassembles in a Fraction of the Time other Systems Require.

HEADER PIPE
Part # 101

Made of rugged PVC plastic - one man can handle and carry a 20' (6 meter length. You save time and manpower on transportation, installation and removal. Header pipe is available in 4" (100mm), 6" (150mm), 8" (200mm) and 10" (250mm) sizes. Standard header pipe has 7 outlets per 20' (6M) section. A selection of elbows, tees, angle fittings and end caps is available for all header sizes.

HEADER SLEEVE & SNAP-TITE CLAMP
Part # 210 and Part # 211

Leakproof header connections are assured with the rubber slip fit sleeve coupling. Connections are then secured in one stroke with the lever actuated "snap-tite" clamp. There are no bolt-together connections, and no tools or skilled labor are needed.

THE COMPLETE PVC WELLPOINT
Part # 301A

These economical wellpoints are used when a jet rod or punch and casing are used. They feature an innertube for maximum drawdowns. An inside slip coupling is used so the wellpoint riser can be pulled and re-used.

FLEXIBLE PLASTIC SWING JOINT
Part # 307

The all plastic swing joint consists of two Complete "O" Ring equipped elbow connectors linked by a flexible plastic hose. The swing joints simply push into the welltop and into the saddle opening in the header pipe. No wrenches or tools are needed. Note the shut-off valve on the swing joint connector.

THE COMPLETE SWING JOINT ELBOW CONNECTOR
Part # 310

The secret of a reliable, leak-proof system installation is Complete's molded plastic elbow connectors used on each end of the swing joint. Compression fit of 3 rubber "O" Rings (easily replaced) makes a perfect seal. No tools are required and the elbow connectors accommodate either vacuum or pressure without leaking.

THE COMPLETE WELLTOP
Part # 302

Threaded onto a standard riser pipe, the aluminum alloy welltop fitting mates with the elbow connector of the swing joint for quick, secure connections in the field and requires no tools once installed on the riser pipe.

PLASTIC HAT PLUG
Part # 401

A simple, effective way to plug unused header pipe openings, the hat plug just pushes into the opening for a quick, leakproof fit. Requires no tools.

THE COMPLETE SELF-JETTING WELLPOINT
Part # 301

Fabricated around a 1.5" (38mm) i.d. galvanized inner pipe, the Complete Wellpoint features PVC plastic filter screen*, a jet head with a plastic ball  valve for jetting and a saw-toothed tip to penetrate hardpan layers or other tough ground strata. The top coupling threads to standard 1.5" (38mm) riser pipe.

THE COMPLETE WELLPOINT JET HEAD
Part # 305

Designed for rapid jetting installation, the aluminum alloy jet head incorporates a simple, effective ball valve which opens to direct a maximum flow of water through the jetting nozzle during installation, and automatically seals under vacuum pressure when pumping begins, so that water is drawn into the wellpoint only through the PVC filter screen*.

*Request for Information / Request a Catalog
 
 
 
To request more information from Complete Dewatering, please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com