| POWER VENTERS APPLICATIONS
Power venters are required on gas or oil indirect tired
heaters where:
1 Negative pressure exists inside the building
Flue pipes have downward or long horizontal
runs.
3. Flue sizes are reduced to save space and costs.
4. Heaters are vented directly through a side wall with no
vertical stack.
5. Heat exchangers or stacks are extremely cold and and
will not provide adequate draft on start up.
FEATURES
Blower Housing-
Constructed of corrosion resistant aluminized steel
Blower Wheels-
Continuous bladestrip design fabricated of galvanized steel
Rigid backplate adds to reliability of product.
Positive control of hub attachment assures no loose hubs in
normal operation.
Blower Motors
ODP, permanently lubricated ball bearing motors with
internal overload protection and built-in proving switch.
Venters available with 115 volt motors and either 24 volt
or 115 volt control circuits.
Wires color coded for easy installation
Restricting Orifices -
Complete set of orifices and capacity table included with
power venter when needed.
VENTING CAPACITIES
| MODEL |
PV2 |
PV3 |
PV4 |
PV5 |
Btuh
Input |
25,000 thru 100,000 |
120,000** |
25,000 thru 160,000 |
200,000 and 215,000 |
250,000 and 255,000 |
300,000 |
350,000 thru 430,000 |
625,000 |
| Max. Vent Length |
4"
Vent Pipe |
80 ft.* |
50 ft.* |
100 ft.* |
80 ft.* |
60 ft.* |
40 ft.* |
- |
- |
| 6"
Vent Pipe |
- |
- |
- |
100 ft.* |
100 ft.* |
100 ft.* |
100 ft.* |
100 ft.* |
| Air Volume CFM |
@
.0" ESP |
105 |
204 |
315 |
410 |
| @.10"
ESP |
88 |
196 |
290 |
360 |
| @.25"
ESP |
- |
187 |
245 |
320 |
| *
Deduct 10 ft. for vent cap and 10 ft. for each elbow used. ** PV-2 may be used for 140,000 Btuh input up to 30 ft. vent pipe. |
WIRING
DIAGRAMS


For connections to Hastings unit heater or duct
furnace see appropriate wiring diagram enclosed with venter.
For connection to special "systems"
see wiring diagram which accompanies shipment. |