Homepage  
Search
find:
search for:
   
 
Site Navigation
News / Publications
Jobs
Service
   Add this page to Google Bookmarks
   Add this page to Mister Wong
   Add this page to del.icio.us
 
   Hastings Industries Inc.  Heating  

Heating - Page 7

 

 

VHR SERIES VENTILATION/HEAT RECOVERY PACKAGES

Equipment Maintenance

It should not normally be necessary to clean the heat wheel since alternating air flow provides effective self-cleaning. Inert dust passes thru the wheel quite easily. Larger particles such as leaves and insects are trapped by 2" cleanable filters located in both the supply and exhaust air streams. If heat wheel cleaning is desired, however, hot water, low pressure steam, solvents or compressed air may be utilized.

Periodic inspections are recommended in order to maintain the highest possible efficiency. The required frequency, of course, will depend on the type of duty and conditions surrounding the installation. If desired, Hastings highly qualified factory service organization can be retained for start-up and maintenance.

Engineers Specifications

Furnish and install the following ventilation/heat recovery package as manufactured by Hastings Industries, Inc:

Item  Model No Supply SCFM Exhaust SCFM Supply Motor HP Supply E.S.P Exhaust Motor E.S.P Exhaust E.S.P

 

Recovery Effectiveness

Winter Design

Summer Design

Exhaust Supply Exhaust Supply Exhaust Supply Exhaust Supply
Entering Leaving Entering Leaving Entering Leaving Entering Leaving
FBD/FWB FBD/FWB FBD/FWB FBD/FWB FBD/FWB FBD/FWB FBD/FWB FBD/FWB

A. Regenerative type heat recovery wheel with (bondex) (desiccant) coated aluminum heat transfer media shall be furnished. Wheel shall have air seals and be belt driven by a fractional horsepower constant-speed gear motor.

B. Package shall have weatherproof housing suitable for rooftop mounting with lifting lugs, drain connections, side access panels and base frame.

C. Forward curved, double width/double inlet, class 1 fans with open drip-proof motors shall be supplied for both supply and exhaust.

D. Back-draft dampers and banks of filter racks for 2" cleanable filters shall be supplied for both exhaust and supply airstreams. A louver and birdscreen shall also be provided for fresh air intake.

E. Warm-side of exhaust shall be insulated with fiberglass of one inch thickness to provide for greater energy retention.

F. Factory-wired controls and starters shall be furnished. A remote-control panel with operating switches and indicating lights shall also be included.

 

In order to maintain our policy of continuous product improvement, we reserve the right to chan prices, specifications, ratings or dimensions without notice or obligation.

*Request for Information / Request a Catalog
 
 
 
To request more information from Hastings Industries Inc., please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com