Homepage  
Search
find:
search for:
   
 
Site Navigation
News / Publications
Jobs
Service
   Add this page to Google Bookmarks
   Add this page to Mister Wong
   Add this page to del.icio.us
 
   HGP Industries Inc.  Stackwall Systems  

Guide Specifications - page1

 

 

HGP logo

Guide Specifications

I. GENERAL

A. Description of Work

1 . Complete structural glazing system: Glass mainplates, glass stiffeners, glass entrance doors (where applicable), metal framing for doors (where applicable), metal perimeter glazing channels, metal fasteners and sealants.

2. Labor and equipment, and services necessary to install all work of this section as shown on the approved shop drawings, as specified, and as required by job conditions.

B. Related work specified elsewhere

1. Structural Steel

2. Perimeter caulking

3. Curtain wall systems

C. Quality Assurance and Performance

I . General-The manufacturer shall design and fabricate the STACKWALL in accordance with the manufacturers' established practices and as shown on the approved shop drawings.

2. installation must be performed by an installation company approved by Tempglass and in accordance with "STACKWALL erection and glazing instructions"

3. Structural performance: A substantially identical STACKWALL System shall have been tested to design loads in accordance with ASTM E 330 by an independent testing laboratory. For earthquake-prone areas the STACKWALL System will be designed to allow for 1.5% lateral racking for seismic requirements.

4. There shall be no uncontrollable air or water infiltration through the STACKWALL assembly when tested in accordance with ASTM E 33 1.

5. System will be designed to provide for live loads imposed by operation of doors. Doors shall comply with applicable handicap and fire codes.

6. When the STACKWALL System is floor loaded, it will not impose dead load on the structure above. Structural support at the head of the opening is required for cantilevered systems.

D. Submittals

1. Submit shop drawings including elevation drawings, sections and details at no less than 1/4 scale showing glass types and thicknesses, joining details, anchorage fastening and sealing methods, metal finishes, door hardware, glazing sealants, setting blocks, shims and spacers.

2. Submit substantiating engineering calculations, test reports and other supporting data as requested by architect.

3. Submit samples as requested
a. Glazing materials
b. Metal components & finishes

E. Guarantee

1. Provide two (2) year warranty, cosigned by manufacturer and installer.

II. MATERIALS

A. Manufacture: The structural glass wall system shall be STACKWALL as manufactured by Tempglass.

 

Request for Information / Request a Catalog from HGP Industries Inc.
 
 
 
To request more information from HGP Industries Inc., please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com