   HGP Industries Inc.  Stackwall Systems  

Guide Specifications - page2

 

 

HGP logo

B.

Mainplate Glass: Monolithic or insulating glass shall be fully tempered safety glazing as defined by ASTM C 1048, ANSI Z97.1 or CPSC 16CFR 1201.

C.

Stabilizers: Shall be 3/4" or 1" full tempered safety glazing as defined by ASTM C 1048, ANSI Z97.1 or CPSC 16CFR 1201.

D.

Patch Fittings: Shall be 6061-T6 aluminum alloy meeting ASTM B221. Fasteners shall be Grade 8 Cadmium plated hardened steel. Patch covers or cap finish shall be stainless steel, anodized aluminum, brass, or painted aluminum as specified.

E.

Perimeter glazing channels: Shall be 6063- T5 aluminum alloy meeting ASTM B221 matching the profile on approved shop drawings, size as required by glass thickness and glazing requirements.

F.

Sealants: Structural glazing joints must be glazed with an approved structural glazing sealant, such as GE Ultraglaze 4000, GE Construction 1200 (monolithic glass), or Dow Corning 795. Perimeter weather seal shall be a silicone weather seal product, such as GE Silglaze or Dow Corning 790.

G.

Setting blocks: Shall be silicone compatible material as shown on shop drawings.

Ill. EXECUTION

A.

Inspection: Verify that the openings are of correct size and that adjacent materials are plumb and level.

B.

Pre-glazing conference: Verify glazing sequence and protection of completed work.

C.

Installation: Install STACKWALL and related work using experienced workmen as specified, as detailed on the approved shop drawings, and in accordance with STACKWALL erection and glazing instructions provided by Tempglass. STACKWALL shall be installed plumb, level, square and true, securely anchored in place, with all joints neatly siliconed smooth. STACKWALL jobsite technicians will be provided as required to insure a quality installation.

D.

Completed STACKWALL installation will be protected from damage during construction in accordance with provisions of the Contract and the General Contractors instructions. Protecting devices will be removed upon completion of project and the glass will be cleaned to the satisfaction of the Architect. Final cleaning is by others.

 

 

Request for Information / Request a Catalog from HGP Industries Inc.
 
 
 
To request more information from HGP Industries Inc., please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com