MULTI-CLAMP EXPLODED VIEW
Basic Mounting Methods and Assembly

*APPROPRIATE SIZE SPLIT BUSHING IS SLIPPED
OVER
EACH LINE TO BE INSTALLED. LINE AND BUSHINGS ARE
THEN SEATED INTO THE LOWER CLAMPING UNIT AFTER
IT HAS BEEN SECURED. |
A Socket-head Stacking Nut, shown at A,
is used in combination with either B, a Thread Adapter, C,
a Self-tapping Adapter, or D, a Weld Adapter, to secure the lower
Clamping Unit directly to a mounting surface. The Stacking Nut is also used in combination
with E, a Thread Adapter, lockwasher, and standard nut to attach the
lower Clamping Unit through a drilled hole in mounting to a plate of 3/8 inch (or less)
thickness.
After inserting Junction Adapters or Split Bushings and Lines into the lower Clamping
Unit, the upper Clamping Unit is attached by positioning it over the Lower Clamping Unit
and placing G, a standard bolt and lockwasher, through each mounting hole
and threading the bolt securely into its corresponding Stacking Nut. This completes the
assembly of a basic MULTI-CLAMP
In bridge mounting between two columns, or when a MULTI-CLAMP is suspended from a column,
either the E combination or F, a standard bolt and
lockwasher, can be used to secure the Stacking Nut to the lower Clamping Unit. H
Mounting Adapters are placed into appropriate holes, the lines or Junction Adapters
installed, the upper Clamping Unit attached, and the complete assembly then secured by the
Mounting Adapters and standard bolts. |