| Search |
|
|
|
| |
| Site Navigation |
|
|
|
| News / Publications |
|
|
|
| Jobs | |
|
|
| Service |
|
|
|
|
|


|
| |
|
| |
Johns Manville Commerical Industrial Roofing Systems\Roof Insulations Roof Insulations - Page 10
 |
Roof Insulations |
|
E'NRG'Y
2 Roof Insulation |
Underwriters Laboratories
ENRGY 2 is classified by Underwriters
Laboratories, Inc. (UL) and
Underwriters Laboratories Canada as an approved insulation for numerous Class A roof
constructions. Contact JM for details regarding specific approvals.
ENRGY 2 is listed by UL for use in Construction
Numbers 76, 120, 123 and 192. See the current UL Roofing Materials and
Systems Directory.
UL Fire-Rated Assemblies
ENRGY 2 is listed by Underwriters Laboratories,
Inc. for use in fire-rated
assembly design numbers P225, P230, P259, P508, P510, P514, P519, P701, P710, P713, P717,
P718, P719, P720, P722, P723, P724, P727, P728, P729, P730, P732, P734, P735, P739, P801,
P814, P815, P818, P819, P827 and P828. See the current UL Fire Resistance Directory.
Other Approvals
ENRGY 2 complies with the requirements of ASTM
C 1289 and CCMC 12786-R.
ENRGY 2 has been approved by numerous municipalities including Dade County, FL
and California State Insulation Quality Standards and Title 25 Foam Flammability Criteria.
ENRGY 2 also meets the requirements of BOCA, ICBO, SBCCI and others.
Because this insulation complies with both FM 4450 and 4470
when tested in roof membrane
assemblies, and is listed as a FM Class 1 roof insulation, there is no requirement for the ½" (13 mm)
gypsum wallboard or equivalent
thermal barrier," when applied in steel deck roofing applications to meet code
requirements (e.g., SBCCI, BOCA, ICBO, etc.). The local code official does have final
discretion for approval of roof assemblies. Fire-rated roof/ceiling assemblies
("P" designs) may require the use of a thermal barrier.
Federal Specifications
ENRGY 2 meets the physical property
requirements specified in Federal
Specification HH-I-1972/Gen and
HH-I-1972/2.
JM insulation products must be protected from open flame
and kept dry at all times.
Install only as much insulation as can be covered the same day by completed roof covering
material. JM will not be responsible for specific building and roof design by
others, for deficiencies in construction or workmanship, for dangerous conditions on the
job site or for improper storage and handling.Technical specifications as
shown in this literature are intended to be used as general guidelines only.
Consult JM for detailed specifications.
Technical Data

For Use Over Metal Decks
The minimum thicknesses of ENRGY 2 insulation
over metal decks are as follows:

Copyright © 19962008 AECinfo.com
|
|