   Maxxon Corp.  Level-Right PLUS  

Multi-Purpose Self-Leveling Floor Underlayment

 

 

Installation
Preparation
Concrete subfloors must be fully cured, moisture free and have no efflorescence. The substrate surface shall be clean, dust and contaminant free. Cracks should be filled with a crack filler or an elastomeric compound. Plumbing or electrical penetrations should be packed with insulation and sealed.

Priming
To promote proper hydration and to ensure a solid bond, the subfloor must be coated with Maxxon Floor Primer. Level-Right PLUS should not be poured without first priming the subfloor.

Mixing
The Level-Right PLUS should be mixed using Maxxon-approved pumping equipment. 

Testing
For Level-Right PLUS, field testing must be performed in accordance with modified ASTM C 109. Before independent sampling, contact the Maxxon quality control department to ensure that proper procedures are followed.

Limitations
(1) Do not pour Level-Right PLUS where the floor temperature is less than 40º F (4.5º C) or greater than 100º F (37.7º C)

(2) Protect the poured mortar from wind and sun, and from freezing temperatures for the first 72 hours.

(3) The concrete subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

(4) Level-Right PLUS is for interior use only; it is not a wearing surface.

(5) Level-Right PLUS will not structurally bridge over expansion joints, saw cuts or structural cracks. They should be allowed to continue through the Level-Right PLUS. The architect or structural engineer must specify expansion joints and show their location in areas that will receive hard surface floor goods such as ceramic or marble tile, and hardwood flooring.

(6) For deeper fills, call Maxxon Corporation for the Application Bulletin.

(7) For applications other than those over structural concrete call Maxxon Corporation for the Application Bulletin.

(8) Concrete, moisture or vapor emission must be eliminated by others prior to a Level-Right PLUS application for below grade, on grade or suspended slabs.

Another Level-Right PLUS Success Story

Project Site:
AmeriSuites Hotel at Mall of America, Bloomington, Minn.

Applicator:
Acoustical Floors, Inc., Hamel, Minn.

Sales & Service Center:
Maxxon Midwest

Project Scope:

  • 49,000 sq. ft. of Level-Right PLUS @ 3/4" pour
  • 141 hotel rooms on the 2nd through 6th floors of newly constructed hotel complex

Contractor:
BTO Development, Minnetonka, Minn.

*Request for Information / Request a Catalog
 
 
 
To request more information from Maxxon Corp., please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com