Step 1 Prepare Base
Begin by excavating a trench approximately 12 inches wide by 4 inches deep. It is
important to remove sod and other organic materials. It is also important to partially
embed a portion of the bottom course to hold it firmly in place.
After excavating, make sure that the bottom of the trench is well compacted. Use a hand
tamper to compact the soil if necessary. Spread a 1-inch layer of sand in the trench. The
base is now ready for the base course of Handy-Stone II. |
 |
Step 2 Position Base Course
Lay the base course units on your prepared base. You may remove a small amount of sand to
make room for the alignment lips, remove alignment lips, or place base units upside down
with alignment lips facing forward. Level each unit side to side, front to back, and with
adjacent units. A rubber mallet will help to level units and a string line can be used to
keep units straight. |
|
Step 3 Lay Succeeding Course
Position the second course of Handy-Stone II units so that alignment lips overhang the
back edge of the base course and edge joints are staggered with those of the lower units. |
 |
Step 4 Backfill As You ProceedBackfill behind each course as you proceed. Gravel backfill is
recommended to help with drainage. Continue laying additional courses and backfilling
until desired height is achieved. |
|
Step 5 Secure Top Course (optional)If it is critical to prevent units from being removed, secure them
using a good concrete adhesive. |
 |
|