Homepage  
Search
find:
search for:
   
 
Site Navigation
News / Publications
Jobs
Service
   Add this page to Google Bookmarks
   Add this page to Mister Wong
   Add this page to del.icio.us
 
   QC Construction Products  QC Construction Products - Quality Architectural Concrete  

Wall Liner Systems - Page 42

 

 

QC Construction Products®

WALL LINER SYSTEMS

Product Information Bulletin

SPECIFICAITI0NS:


1.00 GENERAL

Description

a. The work in this section shall be designated as QC CONSTRUCTION PRODUCTS WALL LINER SYSTEMS in the plans. The work shall include labor, materials and equipment required to complete the installation.


Definitions


a. QC CONSTRUCTION PRODUCTS WALL LINERS: Formliners that produce patterned and textured vertical concrete surfaces. The QC CONSTRUCTION PRODUCTS WALL COLORING SYSTEM used with the QC WALL LINERS is optional as detailed in Section 2.00 below. It is recommended to contact your QC CONSTRUCTION PRODUCTS distributor for consultation regarding the appropriate coloring system prior to writing specifications.



2.00 PRODUCTS AND MATERIALS


a. Concrete Mix Design: The concrete mix shall conform to the architect/engineer's guidelines and recommendations established by the American Concrete Institute.

b. Reinforcement: All concrete shall be reinforced in accordance with the guidelines and recommendations of the American Concrete Institute.

c. QC CONSTRUCTION PRODUCTS INTEGRAL COLOR (optional): The concrete shall be colored using the following QC INTEGRAL COLOR(s):_________________

d. QC CONSTRUCTION PRODUCTS VERTICAL STAIN (optional): The concrete shall be colored using the following QC CONSTRUCTION PRODUCTS VERTICAL STAIN(s):________________________

 

e. QC CONSTRUCTION PRODUCTS ANTI-GRAFFITI WALL BARRIER (optional): The concrete shall be coated with QC ANTI-GRAFFITI WALL BARRIER.

f.    QC CONSTRUCTION PRODUCTS WALL LINERS: The concrete shall be patterned and textured using the following QC CONSTRUCTION PRODUCTS WALL LINER(s):_________________-


3.00 EXECUTION
Installation Procedures

a.    Excavation and preparation of trenches for footings shall be performed in accordance with industry standards.

b.    All footings shall be placed per engineer's specifications in accordance with industry standards.

c.    The form work shall be installed and properly braced in accordance with the plans.

d.    Provide and place reinforcement as specified in the plans.

e.    Place concrete into forms and properly vibrate to insure maximum consolidation and to minimize bugholes at the face of the concrete.

f.    Sack and patch any necessary areas on the vertical concrete surface to create the desired finish of the wall system.

g.    Optional: The concrete shall be colored using the QC WALL LINER COLORING SYSTEM. See the various Product Information Bulletins for specific installation procedures.

h.    The concrete surface may be sealed, following wall liner removal, necessary detail work and coloring as specified, in accordance with manufacturer's recommendations.

QC Construction Products are available through:

For ordering
information call
800-453-8213                

QC Construction Products®

MADERA, CA

1/96

*Request for Information / Request a Catalog
 
 
 
To request more information from QC Construction Products, please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com