| TECHNICAL INFORMATION b. All hip, ridge, rake and first row of cover tiles after gable
roll shall be set in cement mortar and fastened by non-corrosive nails.
6. All tile in contact with cement mortar shall be immersed
in water for two minutes before laying.
7. To avoid color problems on roof:
- Roof load tiles from different pallets.
- Visually inspect application from the ground level after
installing 100 tiles.
- Visually verify that roof tile color is uniform and even,
and verify that tile courses are straight and true.
8. Correct any color or installation problems before
proceeding with the installation.
9. Complete installation to provide weather tight service.
3.03 CLEAN UP
A. Clean roof to remove all pieces of debris.
B. Remove and dispose of all work-related refuse and
debris.
END OF SECTION |