Homepage  
Search
find:
search for:
   
 
Site Navigation
News / Publications
Jobs
Service
   Add this page to Google Bookmarks
   Add this page to Mister Wong
   Add this page to del.icio.us
 
   Schindler Elevator Corp.  Technical Data  

Technical Data - Page 61

 

 

Schindler 300A

Semi-holeless Applications

zsch061a.gif (15614 bytes)

zsch061b.gif (15183 bytes)

zsch061c.gif (14237 bytes)
zsch061d.gif (6107 bytes)

Capacity (ibs) Std. Speed (fpm) Maximum Standard Clear Opening & Door System(ii) Platform Size Minimum Clear Cab Inside
    Openings Travel    

 

A Width B Depth CA Width CB Depth
 

2000

100

125

 

8

30'-0" 3'-0" SSSO 6'-½" 5'-4½" 5"-8" 4'-3"
2500 100

125

145

8 28'-0" 3'-6" SSSO 7'-½" 5'-4½" 6'-8" 4'-3"

 

C9(ix) Clear Width D (iv) Wall to Wall E G I J Q
7'-4" 6'-0" 7¾" 3'-2" 3'-8" 1' 2" 7' 3/4"
8'-4" 6'-0" 2'-1½" 3'-8" 4'-2" 1' 2" 7' 3/4"

 

R S
SSSO Doors SSCO Doors 2SSO Doors SSSO Doors SSCO Doors 2SSO Doors
3' -6" - - 10" - -
4'-0" - - 10" - -

 

Notes

Dimensions shown are for U.S. applications. For specific requirements in Canada, please consult your local Canadian sales office.

(i)    Maximum standard travel based on Cab 125 (8'-0" high), 4'-0" pit and across the line starting. Higher travel may be available under some conditions. (Contact your local sales representative.)

(ii)   SSSO doors available with right or left opening.

(iii)    Minimum pit depth is 4'-0". Maximum travel will be decreased one inch for every inch of pit depth above 4'-0" . For maximum pit depth on semi-holeless application, consult your local sales representative

(iv)   For travel greater then 9'-6", jack hole may be required. Jack hole depth equals travel minus pit depth minus 54" (minimum jack hold wherequired is 1'-6").

(v)    Hoistway depth increases 1½" with flush transoms.

(vi)    Hoist Beam to be removed by othgers after elevator installation if minimum cab clearance is not available.

(vii)     For maximum rail bracket vertial spacing consult your local sales representative.

(viii)     Adequate steel or concrete beam or concrete wall supports are required for rail mounting brackets based on elevator shop drawing loadings at each floor per ASME A 17.1. Mounting and interface between building support and rail bracket to be in agreement between customer and elevator contractor.

(ix)    Add 4" for less than 4000 lbs. and 6" for 4000 lbs. and larger in seismic zone 2 or greater.

 

zsch061e.jpg (5445 bytes)

Request for Information / Request a Catalog from Schindler Elevator Corp.
 
 
 
To request more information from Schindler Elevator Corp., please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com