| Search |
|
|
|
| |
| Site Navigation |
|
|
|
| News / Publications |
|
|
|
| Jobs | |
|
|
| Service |
|
|
|
|
|


|
| |
|
| |
Seattle Glass Block, Inc AAMA/NWWDA Structural Test AAMA/NWWDA Structural Test - Page 1

3310 Hill Avenue •Everett, Washington 98201 •Phone: (206) 259-6799 •FAX: (206) 259-4936
AAMA/NWWDA STRUCTURAL TEST
S97-230
REPORT TO: |
SEATTLE GLASS BLOCK
12532 AURORA AVENUE N.
SEATTLE, WA 98133 |
ORIGINAL REPORT NUMBER: S97-230
ORIGINAL REPORT DATE: 08/07/1997
PRODUCT: ALL VINYL WINDOW SYSTEM.
REPORT TO: |
Seattle Glass Block
12532 Aurora Avenue North
Seattle, WA 98133 |
TEST DATE: |
08/07/1997 |
SPECIFICATION: |
AAMA/NWWDA 101/I.S.2-97 Voluntary Specifications for Aluminum, Vinyl (PVC) and Wood Windows and Glass
Doors. |
PERFORMANCE CLASS: |
F-R70 49 x 49 |
DESCRIPTION OF SAMPLE TESTED
MODEL/TYPE: |
All Vinyl Window System. |
CONFIGURATION: |
O (36 TIDL Lites). |
FRAME SIZE: |
49 1/8" wide by 49 1/8" high. |
FIXED DAYLIGHT OPENING: |
Not Applicable. |
FRAME TYPE: |
Vinyl. |
JOINT CONSTRUCTION: |
All corners were mitered, fitted with metal corner keys, and screw-connected. All corner joints were silicone
sealed. |
GLAZING
COMPONENTS: |
|
|
BLOCK SIZE: |
7-3/4" wide by 7-3/4" high each. |
|
BLOCK DEPTH: |
3-1/8" deep. |
|
MORTAR COMPOUND: |
None. |
GLAZING SYSTEM: |
The 36 glass blocks were arranged 6 columns wide by 6 rows high, bedded against double sided foam glazing
tape and silicone sealant on the interior side of the glazing pocket and retained by vinyl snap bead on the exterior
side. Silicone sealant was also used around the entire perimeter interior frame to glass joint, all vinyl spacer to
glass block joints, and all interior and exterior glass block joints. The glass blocks were separated by a vinyl stack
spacer system. |
WEATHERSTRIP: |
None. |
INTEGRAL VENTILATING
SYSTEMS/DEVICES: |
None. |
REINFORCEMENT: |
None. |
WEEP SLOTS: |
|
|
SIZE: |
1/2" wide by 1/8" high slots. |
|
LOCATION: |
From the fixed glazing pocket, draining through the exterior bottom snap bead at 9-1/4" from each end. |
WEEP COVERS: |
None. |
TEST RESULTS
2.1.2 |
Air Infiltration at 1.57 psf.
ASTM E283-91
The tested specimen meets or exceeds the performance levels specified in AAA/NWWDA 101/I.S.2-97 for air infiltration.
Maximum Allowable = 0.3 CFM/FT2
Optional Information
Total CFM = <0.10 CFM
Infiltration Rate = <0.01 CFM/ft2 |
2.1.3/4.3 |
Water Resistance Test.
ASTM E547-96 and ASTM E331-96 when applicable.
No Leakage after 4 cycles of 5 minutes each at 15.00 psf.
No Leakage after 1 cycle of 15 minutes at 15.00 psf. |
2.1.4/4.4 |
Uniform Load Structural Test
ASTM E330-90
No damage after positive 105.0 psf.
No damage after negative 105.0 psf. |
2.1.7 |
Welded Corner Test (PVC Products Only)
Not Applicable. |
2.1.8 |
FORCED ENTRY RESISTANCE
Type V Window Assembly
TEST
Disassembly
Hand Manipulation Test
Tool Manipulation Test |
Passed CMBSO 1-79, CAWN 301
RESULT
Removed all exterior vinyl snap bead. No other window components were accessible or removable.
No Entry
No Entry |
|
NOTES: The disassembly sequence and the hand and tool manipulation tests were each conducted continuously for a 5 minute period.
Copyright © 19962008 AECinfo.com
|
|