architecture - engineering - construction
Sub-Zero
Design Guide
Design Guide - Page 8
Design Guide
600 SERIES PLANNING INFORMATION
Planning Information
Although the 600 Series offers a wide range of designs and configurations, the basic planning considerations for all models have much in common. As you integrate Sub-Zero units into your overall plan, review installation requirements for your particular units. Illustration 1 and the Pre-Installation Specifications chart provide planning information for all Sub-Zero 600 Series units framed, overlay and stainless steel.Allow units to open a minimum of 90 degrees or youll have problems removing drawers. With the door opening 90 degrees, you may have to move drawers slightly to clear the door interior. Refer to the minimum door clearances in the Pre-Installation Specifications chart.
IMPORTANT NOTE: Refer to the full scale illustrations at the end of this section for specifics on door openings and filler size alternatives.
Pre-Installation Specifications
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
|





600 SERIES PLANNING INFORMATION
Planning Information


