architecture - engineering - construction
AECinfo.com
Printable version Bookmark this page Notify a colleague or friend about this page Bookmark and Share
  Trane Company (The)   Horizon Absorption Series  

Horizon Absorption Series - Page 30

   

Horizon Absorption Series

Dimensional Data

Table DD-1 — Machine Dimensions ABTF- 380, 440, 500 — English

Dimension ABTF-380, 440, 500
A 9’-6-7/8"
B 5’-4-1/8"
C 5’-83/4"
D 1’-8"
E 3’-1"
F 5’-10-3/4"
G 7’-2-5/8"
H 3/8"
X 9’-5-7/8"
J 8’-6-3/8"
K 6’-3-1/2"
L 4’-9"
M 3’-1"
N 1’-8"
O 11-1/4"
P 2-3/4"
Z 2’-8-1/4"
R 5’-4-1/8"
U 3’-4-1/2"
V 8’-0-7/8"
W 7’-9-5/8"
AA 21’-3-3/4"
BB 17’-11-1/2"
CC 1’-7-3/8"
DD 17’-10-1/4"
EE 11-1/4"
GG 9’-8-3/4"
HH 3’-5-7/8"
JJ 2’-10-1/2"
KK 13’-6"
LL 3’-6"
MM 3’-7-1/8"
NN 5-1/4"
OO 1’-8-7/8"
PP 4’-6"
RR 1’-1-5/8"

Table DD-2 — Machine Dimensions ABTF-380, 440, 500 — SI (mm)

Dimension ABTF-380,440,500
A 2918
B 1629
C 1749
D 508
E 940
F 1797
G 2200
H 10
X 2892
J 2600
K 1918
L 1448
M 940
N 508
O 286
P 70
Z 819
R 1629
U 1022
V 2461
W 2378
AA 6496
BB 5474
CC 492
DD 5442
EE 286
GG 2965
HH 1064
JJ 876
KK 4115
LL 1067
MM 1095
NN 133
OO 530
PP 1372
RR 346

Customer Notes:

1. Front of unit is determined by facing unit control panel

2. All vertical dimensions include 5 /16" thick isolation pads.

3. Dimensions shown are calculated values.

4. Evaporator, condenser, and absorber water connections are for 8" pipe. Available with 150# grooved connection for use with style 77 Victaulic coupling. Also, available with 150# American Standard raised face flange (flange bolt holes straddle vertical centerline).

5. High temperature generator steam inlet connection is for 2" pipe. Provided with 150# American raised face flange (flange bolt holes straddle vertical centerline).

6. All water box vents are 1 /4" NPT and drains are 3 /4 NPT.

7. Flexible connection must be used for attachment to rupture disk. Do not apply more than 12 PSI internal pressure on machine without removing rupture disc. Pipe rupture disc to floor vent or to the outside to meet local code.

8. Field piping must be arranged and supported to avoid stress on the equipment. It is strongly recommended that the piping contractor refrain from pre-piping closer than 36" minimum to the equipment. This will allow for proper connection upon arrival of the unit at the job site. Necessary adjustments can be made at that time.



Request for Information / Request a Catalog from Trane Company (The)
 
 
 
To request more information from Trane Company (The), please complete the form below.
 
*Name:    
*Email:    
Company:    
*Type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.