| Controls 20-60
Tons Interface Leaving Solution Reset
This flexible option allows active leaving
solution reset based on customer selectable inputs from the zone, entering solution
temperature or outside air temperature. When the application is sensitive to one of these parameters, subcooling of critical zones is
prevented.
External Leaving Solution Setpoint
Remote setpoint potentiometer can
be ordered to allow adjustment of the leaving solution setpoint remotely.
Generic Building Automation
System Module (GBAS)
Two Generic Building Automation System Modules
(GBAS) are available as an option to provide broad
control capabilities for building automation systems, other than the Tranes Tracer® system.
The 0-5 vdc input GBAS Module
contains 4 analog inputs, one binary input for demand limit, and 5 binary outputs.
The 4 Analog inputs can accept a
0- 5 vdc or a three wire potentiometer signal and be assigned to:
1. Leaving Solution Setpoint
2. Ice Build Terminate Setpoint
3. Hot Start Load Limit Setpoint
4. Maximum Capacity Level Setpoint
- The 5 Binary Outputs can be assigned:
- Active Unit Diagnostics
- Compressor running status
- Maximum Capacity (all compressors running)
4,5. Open - Diagnostics can be grouped
or individually assigned by the user and may
be placed in these outputs.
The 0-10 vdc input GBAS module
contains 4 analog inputs, one binary input for demand limit, four analog outputs
and one binary output.
- The 4 analog inputs can accept a 0-
10 vdc signal and be assigned to:
- Leaving Solution Setpoint
- Ice Build Terminate Setpoint
- Hot Start Load Limit Setpoint
- Maximum Capacity Level Setpoint
- The 4 analog outputs can be assigned to:
- Leaving Solution Temperature
- Entering Solution Temperature
- Saturated Condenser Temp. Ckt 1, 2
- Evaporator Temp. Ckt 1, 2
- Liquid Line Pressure Ckt1, 2
- Suction Pressure Ckt 1, 2
- Actual Capacity Level
- Outdoor Air Temperature
- One Binary output can be assigned
to:
- Active Unit Diagnostics
- Compressors Running Status
- Max Capacity
Hot Gas Bypass (HGBP)
The HGBP control allows unit operation below the
minimum step of unloading. Hot gas bypass is initiated
when the last capacity step is running and the capacity control algorithm generates a subtract command. HGBP remains energized until
the load increases, the chiller freeze protection
function is activated, a user defined run time has
expired, the low pressure control is open, or the unit goes into ice building mode.
Alarm and Max Capacity Relay
These features are user selectable
and are mutually exclusive of each other. If the alarm relay output is selected,
it will provide a way to trigger a field supplied alarm
whenever the UCM detects a fault requiring manual reset. The customer can
assign which fault modes will trigger the alarm relay.
The alarm will deenergize when the manual reset is
cleared. When Max Capacity Output is selected, it will trigger a field installed
device indicating the unit has reached its maximum
cooling stage; this gives the customer the ability to
turn on auxiliary systems to manage comfort.
Ice Building Control
A contact closure on the UCM allows either a field
installed device or an ICS system to initiate the unit
to operate in the ice building mode. In this mode
normal chiller temperature control is bypassed and the unit runs fully loaded
until ice building is complete. There are two optional
ice building modes that can be selected through the HI. Ice building is terminated when the customer provide contacts are opened,
Ice Building Stop is initiated from the Tracer, or the
entering solution temperature reaches or drops below the ice building terminate
setpoint.
When the entering solution
temperature reaches the terminatesetpoint,the unit will go through pumpdown if enabled and
remain in Ice.Complete standby mode until the ice build mode is terminated.
- Option 1 - One time Ice building
mode allows the unit to run fully loaded until the entering solution temperature falls to the active ice building
terminate setpoint (IBTS) When the entering solution
temperature reaches the terminate
setpoint (IBTS).
- Option 2 - Continuous ice build
mode allows the unit to run fully loaded until the entering solution temperature falls to the active ice building
terminate setpoint (IBTS). When the entering solution
temperature reaches the terminate setpoint, the unit will go through pumpdown if
enabled, and remain in Ice build delay. The unit will
remain in ice build stand-by until the ice build
timer expires. The unit will then start the pump and wait for the loop stabilization
timer to expire. The unit will run fully loaded until
the entering solution temperature falls below the
ice build termination setpoint. The unit will continue cycling through these ice
building states until the Ice build mode is terminated
or changed to option 1.
|