The Vistawall Group Vistawall Architectural Production Vistawall Architectural Production - Christofer Oaks - Page 13
| Project:
|
Christofer
Oaks, Phase II, Sacramento, CA |
| Architect: |
Carissimi,
Rohrer and Harper Architects, Sacramento, CA |
| General
Contractor: |
Harbison-Mahoney-Higgins
Inc., Sacramento, CA |
| Glazing
Contractor: |
Cabbledick-Kibbe
Inc., North Highlands, CA |
 |
JOB SUMMARY
This attractive, $2.85 million, 3-story office building utilizes
the Vistawall CG-450 1 3/4" by 4 1/2" stack framing system
in the strip windows areas. The storefront is CG-750 2 3/4"
by 7" monumental center-glazing framing. Vistawall also offers
a 2" by 4 1/2" system in a front-load design. Both systems
received a Bone White painted finish to match the ceramic tile building
skin.
A new blue-green reflective, insulated glass was
used to highlight the building while radiused corners of metal and
glass provided a very nice touch to the project. Some of the building
corners employ the use of curved, reflective and insulated units.
|
Copyright © 1996-2008 AECinfo.com
|
|