   Willamette  Wood Construction Connectors  

Wood Construction Connectors - Page 28

 

 


                ®
ABA/ABE/ABU/PBS/CBS

STANDOFF POST BASES


CAPS & BASES

 

Provides tested capacity. Features 1" standoff height above concrete floors, code-required when supporting permanent structures that are exposed to the weather or water splash, or in basements. Reduces the potential for decay at post and column ends.

One-piece ABA provides uplift capacity, with no pieces to lose on the jobsite. For new or retrofit construction.

ABE and ABU's base design includes anchor bolt adjustment slot. Four-sided standoff plate increases download support and provides attractive appearance. New size ABU for 8x8.

MATERIAL: See table.

FINISH: Galvanized. Some products available in Z-MAX; see Corrosion-Resistance, page 6.

INSTALLATION:

  • Use all specified fasteners.See General Notes.
  • Not recommended for non-top-supported installations such as fences.
  • CBS and PBS embed into wet concrete up to the bottom of the 1" standoff base plate. A 3" minimum side cover is required to obtain the full load for CBS; 2" for PBS. Holes in the bottom of the PBS and CBS straps allow for free concrete flow.
  • ABA, ABE and ABU -- for pre-pour installed anchors, embed 4" into concrete. For epoxy or wedge anchors, select and install according to anchor manufacturer's recommendations; anchor diameter shown in table.Install required washer -- not included for ABAs.
  • See Anchoring Systems, pages 22 and 23, for tested, load-rated epoxies.

CODES: BOCA, ICBO, SBCCI NER-422, NER-432, NER-469; City of L.A. RR 25064, 25074, 25158;  DadeCo. FL. 93-1016.1.

Typical ABE46R Installation for rough lumber (ABE similar)

ABU88 (available in rough size ABU88R)

Model No. Nominal Post Size Material Dimensions Fasteners Uplift Avg Ult
Base (Ga) Strap (Ga) W1 W2 D L HB Anch. Dia Post
Nails Bolts
Qty Dia
ABA44 4X4 16 16 3-9/16 3-1/2 -- 3-1/8 -- 1/2 6-10d -- -- 2120
ABE44 4x4 16 16 3-9/16 3-1/2 --  3-1/2 --  1/2 6-10d --  --  1893
ABU44 4X4 16 12 3-9/16 3-1/2 3-1/2 3 1-3/4 5/8 12-16d 2 1/2 7833
PBS44A 4x4 12 14 3-9/16 3-1/2 3-1/2 2-1/4 3-7/16 --  14-16d 2 1/2 7733
CBS44 4x4 12 10 3-9/16 3-1/2 7-1/8 2-1/4 4-5/16 --  --  2 5/8 16667
ABA44R RGH 4x4 16 16 4-1/16 3-5/8 --  3-1/8 --  1/2 6-10d --  -- 2120
ABE44R RGH 4x4 16 16 4 3-1/2 --  3-1/2 --  1/2 6-10d --  --  1893
ABE46 4x6 12 16 3-9/16 5-3/8 --  5-7/16 --  5/8 8-16d --  --  5167
PBS46 4x6 12 14 3-9/16 5-7/16 3-1/2 2-1/4 3-3/8 --  14-16d 2 1/2 7733
ABA46 4x6 14 14 3-9/16 5-7/16 -- 5-3/16 --  5/8 8-16d --  --  2967
CBS46 4x6 12 10 3-9/16 5-7/16 7-1/8 3 4-1/2 --  --  2 5/8 16667
ABU46 4x6 12 12 3-9/16 5-3/8 --  5 2-5/8 5/8 12-16d 2 1/2 8633
ABE46R RGH 4x6 12 16 4-1/16 5-3/8 --  5-7/16 --  5/8 8-16d --  --  5167
ABA46R RGH 4x6 14 14 4-1/16 5-7/16 --  5-3/16 --  5/8 8-16d --  --  2967
PBS66 6x6 12 12 5-1/2 5-3/8 5 2-1/4 3-11/16 --  14-16d 2 1/2 13100
ABA66 6x6 14 14 5-1/2 5-7/16 --  5-1/4 --  5/8 8-16d --  --  3050
CBS66 6x6 12 10 5-1/2 5-7/16, 6-7/8 3 4-1/2 --  --  2 5/8 24000
ABE66 6x6 12 14 5-1/2 5-1/2 --  5-7/16 -- 5/8 8-16d --  --  4833
ABU66 6x6 12 10 5-1/2 5-3/8 --  5 1-3/4 5/8 12-16d 2 1/2 8900
ABA66R RGH 6x6 14 14 6 5-7/16 --  5-3/16 --  5/8 8-16d --  --  3050
ABE66R RGH 6x6 12 14 6-1/16 5-1/2 --  5-7/16 --  5/8 8-16d --  --  4833
ABU885 8x8 12 14 7-1/2 7 -- 7 -- 2-5/8 18-16d -- -- 12893

Allowable Loads

Uplift (133) Uplift (160) F1 (133 & 160) F2 (133 & 160) Down (100)

 

Nails Bolts Nails Bolts Nails Bolts Nails Bolts
555 -- 555 --- -- -- -- -- 6000
520 --  520 -- -- -- -- -- 6665
2200 1800 2200 2160 -- -- -- -- 6665
2400 2400 2400 2400 1165 230 885 885 6665 
--  5335 --  5335 --  --  --  -- 9665
555 --  555 -- -- -- -- -- 8000
400 --  400 -- -- -- -- -- 6665
810 --  810 -- -- -- -- -- 7335  
2400 2400 2400 2400 1165 360 885 885 9335
935 --  935 -- -- -- --  --  9435
--  5335 --  5335 --  -- -- -- 10000
2255 2300 2300 2300 --  --  -- -- 10335
810 --  810 -- -- -- -- -- 7335
935 --  935 -- -- -- -- -- 12000
2630 3560 3160 4000 1865 570   1700  1700  9335 
985 --  985 -- -- -- -- -- 10665
--  5560 --  6675 --  -- -- -- 13000
900 --  900 -- -- -- -- -- 15000
2300 2300 2300 2300 --  --  --  -- 15000
985 --  985 -- -- -- -- -- 12665
900 --  900 -- -- -- -- -- 15000
2320 -- 2320 -- -- -- -- -- 24335
  1. Uplift and lateral loads have been increased 33% and 60% for earthquake or wind loading; no further increase allowed. Reduce by 33% and 60% for normal loading.
  2. Downloads may not be increased for short-term loading.
  3. For higher downloads, solidly pack grout under 1" standoff plate before installing CBS into concrete. Base download on post or concrete, according to the code.
  4. Specifier to design concrete for shear capacity.
  5. ABU88 may be installed with 8-SDS1/4X3 wood screws for the same table load.

Request for Information / Request a Catalog from Willamette
 
 
 
To request more information from Willamette, please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com