PBV POST BASE
|

Simpson's hidden standoff post base for Viga posts. The PBV6 fits a
6" or 8" diameter viga post, and the PBV10 fits a 10" or 12" diameter
post.
MATERIAL: 14 gauge
FINISH: Galvanized or painted; check with factory.
INSTALLATION:
- Footing installation: Drill a 3/4" hole
10" deep min. into the center of the viga post. Clean out dust. Half fill the hole
with SET epoxy. Insert the all-thread rod, and allow epoxy to set. Slip PBV over the rod
and secure to the post.
- Drill a W hole 5" deep minimum into the center of the footing.
Clean out dust. Half-fill the hole with SET epoxy. Insert the all-thread rod into the
hole.
- 4" minimum slab installation: Drill hole into
viga post as noted above. Align post surface with edge of slab. Mark center of post on
slab. Drill a 3/4" hole 3-1/2" deep into slab. Half fill the hole with SET
epoxy. Insert the all-thread rod into hole.
- Not recommended for non-top-supported installation such as fences.
| Model
No. |
Fasteners
|
Uplift
Avg Ult |
Allowable
Loads |
| Post
|
Anchor
Bolt |
Uplift
|
Down
|
| PBV6 |
4-SDS1/4X3 |
5/8" |
10,500 |
2985 |
9250 |
| PBV10 |
4-SDS1/4X3 |
5/8" |
10,500 |
2985 |
15865 |
- Uplift loads are increased 33% and 60% for earthquake or wind
loading; no further increase allowed. Reduce by 33% and 60% for normal loading.
- Download may not be increased for short-term loading.
- Download based on 700 psi wood bearing for Ponderosa Pine.
- Min edge dist. for table loads is 4-3/4".
- For 4" slab, the allowable uplift load is 1580 lbs with
2-3/4" minimum edge distance.
EPB44T ELEVATED POST BASES

The EPB44T fits 4x posts and beams. Adjustable up and down.
MATERIAL: 12 gauge base, threaded rod support
5/8" x 5" (shipped assembled)
FINISH: Base -- G 60 galvanized, threaded rod --
zinc plate
INSTALLATION:
- Secured with epoxy: Drill a 3/4" hole
2-1/2" deep min. into the concrete. Half fill the hole with epoxy. Insert the EPB44T
and adjust to the desired height. To adjust after the epoxy cures, drill a hole in the
center of the post and turn the post base up or down to the desired height.
- Supported by a nut: Drill a 3/4" hole
2-1/2" deep min. into concrete. Install a 5/8-11 NC nut and cut washer on the
threaded rod. (Nut and washer not supplied). Insert EPB44T into the hole and adjust to the
desired height.
- Embedded in wet concrete: Embed 5/8" rod minimum 4"
embedment.
- Minimum sidecover is 3" from the center of the threaded rod.
- Fully engage at least three threads in the base.
- Not recommended for non-top-supported installations such as fences.
CODE: BOCA, ICBO, SBCCI NER-432.
| Model
No. |
Nails
|
Uplift
Avg Ult |
Allowable
Loads |
| Uplift
|
Lateral
|
Down
|
| (133) |
(160)
|
(133/160)
|
| EPB44T |
6-16d |
3703 |
1130 |
1140 |
410 |
3275 |
- Loads may not be increased for short term loading.
- Uplift & lateral loads require the threaded rod to be set in wet
concrete or attached to cured concrete with epoxy.
- Specifier to design concrete for shear capacity.
EPB ELEVATED POST BASES

The EPB44A is a single-piece, non-welded elevated post base. For
decks, porches: wherever moisture, sanitary, or other conditions require elevated wood
posts.
MATERIAL: EPB44A -- 14 ga.; others -- 12 ga. base
plate, 1-1/16" OD x 8" pipe
FINISH: EPB44A -- Galvanized; all others -- Simpson
gray paint
INSTALLATION:
- Use all specified fasteners. See General Notes.
- Allows 1" to 2-1/2" clearance above concrete, 2" for
EPB44A. Insert EPB into concrete after screeding.
- Not recommended for non-top-supported installations such as fences.
OPTIONS: 12" pipe available for EPB44, 46, 66;
specify "-12" after model number.
CODES: BOCA, ICBO, SBCCI NER-393; City of L.A. RR
24818 (EPB).
| Model
No. |
W
|
L
|
H
|
Nails
|
Uplift
Avg Ult |
Allowable
Loads |
| (133)
and (160) |
Down
(100) |
| Uplift |
F1 |
F2 |
| EPB44A |
3-9/16 |
3 |
2-3/8 |
8-16d |
3600 |
1100 |
815 |
935 |
2670 |
| EPB44 |
3-9/16 |
3-1/4 |
2-5/16 |
8-16d |
3600 |
800 |
985 |
1135 |
3465 |
| EPB46 |
5-1/2 |
3-5/16 |
3 |
8-16d |
3600 |
800 |
985 |
1135 |
3465 |
| EPB66 |
5-1/2 |
5-1/2 |
3 |
12-16d |
-- |
1500 |
985 |
11351 |
3465 |
- Loads may not be increased for short-term loading.
- EPB44 and EPB46 have extra nail holes: only eight must be filled to
achieve table loads.
- Specifier to design concrete for shear capacity
|