   Willamette  Wood Construction Connectors  

Wood Construction Connectors - Page 70

 

 


                ®
DS DRYWALL STOP

MISCELLANEOUS

Eliminates costly blocking at top plate, end walls, and corners. A typical residence will use several hundred of these inexpensive clips with a substantial savings in blocking and labor.

The installation prongs provide even more labor savings.

MATERIAL: 20 gauge

FINISH: Galvanized

INSTALLATION: 16" on center or less, using 8d commons.

CODE: BOCA, ICBO, SBCCI NER-413.


NS NAIL STOPPERS


Help prevent nails from piercing water pipes and electrical lines. Installed over utilities that pass through framing members, the NS provides a warning and allows repositioning of the nails.

16 gauge steel conforms to the National Electric Code.

MATERIAL: 16 gauge

FINISH: Galvanized

INSTALLATION: 8d commons or prongs.


HSS/SS STUD SHOES


HSS available Spring 1999

NEW! HSS Stud Shoes provide tension load capacity as well as increased compression loads. Flared flange provides greater strength. Installs over pipe up to 2" diameter.

Stud Shoes reinforce joists, studs, and rafters notched in construction--NOT a total replacement of removed material.

MATERIAL:18 gauge.

FINISH: Galvanized

INSTALLATION:

Use all specified fasteners. See General Notes.

• HSS: Bend flanges at 90° angle during installation, then bend back and screw into position (screws supplied). 

• Bend flanges one cycle only.

CODE: BOCA, ICBO, SBCCI NER-432 (SS1, SS3).

  Model No. W Fasteners Avg Ult Allowable Loads1
Compression Tension
Floor (100) Roof (125)
SS1 1 9/16 12-10dx1-1/2 1617 500 500 --
SS3 3 12-10d 2433 665 785 --
HSS2 1-9/16 12-SDS-1/4x1-1/4 3600 1200 1200 1000
HSS2-2 3 12-SDS-1/4x1-1/4 3600 1200 1200 1000
HSS4 3-9/16 12-SDS-1/4x1-1/4 3600 1200 1200 1000


1. Roof loads are 125% of floor loads unless limited by other criteria. Floor loads may be adjusted for other load durations according to the code, provided they do not exceed roof loads.

Request for Information / Request a Catalog from Willamette
 
 
 
To request more information from Willamette, please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2009 AECinfo.com