   Willamette  StrucJoist SJ-32-42-55  

StrucJoist SJ-32-42-55 - Page 27

 

 

E-Z Rim® Board Applications, Connections, and Capacities

Design Capacities

  • Vertical Load: 5700 PLF (Cannot be increased for duration of load.)

  • Horizontal wind or seismic shear transfer: 220 PLF (Includes increase for duration of load.)

  • Side bolt connections (deck attachment): 1/2" diameter lag bolts with minimum length of 4" (full penetration in E-Z Rim®) or 1/2" diameter through bolts with washers and nuts: 350 Ibs. per bolt (for normal load duration)

  • For side nail connections into wide face of E-Z Rim® Board use design values per 1991 NDS spruce-pine-fir (G=.42)

Connections: (box or common nails)

l-joist to plate: One 8d nail on each side of web (two per joist), placed 1-1/2" from end to avoid splitting.

E-Z Rim® to l-joist: One 8d nail into top flange and one 8d into bottom flange (two per joist).

E-Z Rim® to plate: Toenail to plate with 16d at 12" on center or 8d at 6" on center.

Floor sheathing to top edge of E-Z Rim®: 8d or 10d nails at 6" on center for shear transfer of 220 PLF. (Closest on center nail spacing allowed is 6")

Willamette Industries

Request for Information / Request a Catalog from Willamette
 
 
 
To request more information from Willamette, please complete the form below.
 
*Name:    
*Email:    
Company:    
*Company type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     






Printable version Bookmark this page Notify a colleague or friend about this pageHome | Terms of Use | Privacy Statement | Link to AECinfo
AECinfo is a member of Docu Group, the world's largest building products information network.



Copyright © 1996–2008 AECinfo.com