Woodfold
Woodfold Roll-Up Doors
Roll-Up Doors - Page 3
Woodfold Roll-Up Doors
MECHANICAL OPTIONS
TUBULAR MOTOR
|
HOW TO ORDER:
List hardwood species, list options required, list finished opening sizes; (A) Width: finished wall to finished wall (or jamb). (B) Height: counter/floor to top of opening.
Specify Lock System: Cylinder lock, thumb turn, or slide bolt.
Specify Operation: Manual operation, awning crank, or electric motor driven.
Specify Mounting Options: Inside, mixed, or outside mount. See detail "Mounting Options" below.
Specify Material: Select hardwoods including Oak, Maple, Birch, Mahogany and Cherry. Other wood species available by request.
Specify Finish: Specify unfinished (factory standard), factory clear finish or custom stain (sample for match required).
Special Note: We recommend the option of Woodfold's factory finishing service. Factory finishing minimizes the problems associated with grease, stains, handling marks, etc., coming in contact with unfinished hardwood Roll-Up doors. Woodfold's factory finish option assures you of the best quality finish available. Time delays associated with job site finishing are further eliminated. The Woodfold Roll-Up Door is ready to use immediately upon installation.
All photographs and material copyrighted 1997

Woodfold-Marco 160,000 sq. ft. manufacturing facility in Forest Grove, OR

Note: Detailed shop drawing forms available upon request. Approved shop drawing required for fabrication. Trim/Casing by others.
Shipping Schedule: All Roll-Up Doors of standard wood species, unfinished, 2 weeks.* All Roll-Up doors with factory clear finish; 3 weeks.* All Roll-Up doors with custom finish; 3 weeks* (approved stain match required.) Other hardwood species subject to timetable established with quotation/order.
(*After shop drawings have been approved.)
Method of Shipment: All Roll-Up Doors will be shipped via LTL Freight.
ca/code acceptability:
Guarantee: Woodfold Roll-Up doors are guaranteed against failures resulting from
defective materials or faulty manufacturing workmanship.
COMPLETED PROJECTS
| Alaska State Ferry Terminal - Anchorage, AK |
| Otero Junior College - La Junta, CA |
| St. Thomas of Canterbury Church - San Jose, CA |
| Prudential Insurance - Santa Fe Springs, CA |
| Disney World - Orlando , FL |
| Trinity Church - Wheaton, IL |
| Lake of the Woods Restaurant - Warroad, MN | |
| Pasta Montana - Great Falls, MT | |
| Concord Hospital - Nashua, NH | |
| State University College - Genesco, NY | |
| Hailey Place Apts. - Pendleton, OR | |
| Carolina`s Hospital - Florence, SC | |
| St. Elizabeth Ann Church - Groton, SD | |
| American Stores Headquarters | |
| | Medi-Sense - Newton, MA |
| | Methodist Hospital - East Peoria, IL |
| | Roosevelt Fire Department - Poughkeepsie, NY |
Due to continuing product development, the information in this brochure is subject to change without notice.
|








