1 In
sealing strip, apply one coat of Xypex Concentrate at the rate of 1.5 lb./sq. yd. (0.8
kg/m2), then fill slot to surface with Xypex Concentrate in Dry-Pac form.
2 Apply one
slurry coat of Xypex Concentrate to walls and floor slab at a rate of 1.25 lb. to 1.5
lb./sq. yd. (0.65 kg to 0.8 kg/m2). After the Concentrate has set but while it is still
green, apply a coat of Xypex Modified at the rate of 1.25 lb. to 1.5 lb./sq.
yd. (0.65 kg to 0.8 kg/m2).
Note 1: For hydraulic elevators, please
contact your Xypex representative for detail drawings.
Refer to Standard Specifications for further
information. |