 |
ALPINE SNOWGUARDS
A Division of Vermont Slate & Copper Services, Inc.
|
PART 1 - GENERAL
1.1 SUMMARY
A. WORK INCLUDES
1. #30 Snowguard that attaches directly to the roof deck.
2. Coordinate with the installation of the roof to
assure proper placement of the snowguards.
3. Provide appropriate snowguard and fasteners for
the roof system.
B. RELATED SECTIONS
1. Section 07600: Flashing and Sheet Metal.
2. Section 07610: Metal Roofing
3. Division 7: Thermal and Moisture Protection.
1.2 SYSTEM DESCRIPTION
A. COMPONENTS:
1. #30 Snowguard system consists of individual metal snow
guards made from same material as roof panel.
2. Fasteners
a. Copper is to be soldered on using 50150 solder.
b. Lead-coated copper is to be soldered on using
60/40 solder.
c. All other metals can be adhered with double-sided
foam adhesive tape.
d. All other metals can be fastened using acceptable
through fasteners.
e. All snowguards should be fastened using good
soldering, fastening or adhering techniques.
B. DESIGN REQUIREMENTS:
1. Horizontal spacing not to exceed 24".
2. Vertical spacing not to exceed 10'.
3. Minimum 6" sq. of the snowguard strap soldered
or adhered to the roof panel.
4. Minimum of 2 fasteners per through fastened snowguard.
4. It is important to design new structures or assess
existing structures to make sure that they can withstand retained snow loads.
1.3 SUBMITTAL - Submit manufacturer's specifications, standard
detail drawings and installation instructions.
1.4 QUALITY ASSURANCE - Installer to be experienced in the installation
of specified roofing material and snowguards for not less than 5 years in the
area of the project.
1.5 DELIVERY / STORAGE / HANDLING - Inspect material upon delivery
and order replacements for any missing or defective items. Keep material dry,
covered and off the ground until installed.
PART 2 - PRODUCTS
2.1 MANUFACTURER
A. Snowguards by Vermont Slate & Copper Services Inc., P.O.
Box 430, Stowe, VT (888) 766-4273.
2.2 MATERIALS
A. Copper Strap, hood and gussett are 16 oz. C.R. copper.
B. Lead-coated Copper Strap, hood and gussett are 16 oz. C.R. copper sheet
stock lead-coated and cut to size.
C. Galvalume Strap and Painted Galvanized, hood and gussett are 24 ga.
D. Aluminum Strap, hood and gussett are.032 Aluminum.
2.3 FINISH
A. Mill finish.
B. Pretinned back of the strap for solder on snowguards.
C. Kynar Tm 500 or HylarTm 5000 prepainted galvanized or aluminum.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Substrate: Inspect roof system to be properly attached
and installed to withstand additional loading incurred. Notify General Contractor
of any deficiencies before installing Alpine SnowGuards.
3.2 . INSTALLATION
Comply with architectural drawings for location and with Manufacturer's instructions
for layout, assembly, and installation
Mail
To:
P.O. Box 430
Stowe, VT 05672-0430 |
Toll Free Phone 1.888.766.4273
Toll Free Fax 888.766.9994
www.alpinesnowguards.com
Email: info@alpinesnowguards.com
|
Ship To:
525 Sterling Valley Rd.
Morrisville, VT 05661
|