Johns Manville 2CNS-W/2PNS-W. CSI 3-Part Specifications.
 |
APP Modified Bitumen Specifications |
|
Specification 2CNS-W/2PNS-W |
Two Ply Heat
Welded Modified Bitumen Smooth Surfaced Roofing System. For use over plywood or other
nailable decks on inclines up to 6" per foot (500 mm/m).
For Regions 1, 2 and 3 |

General
This specification is for use over any type of approved
structural deck (without
insulation) which can receive and adequately retain nails or other mechanical fasteners
that are recommended by the deck manufacturer. Examples of these decks are wood, plywood,
and approved oriented strand board (OSB). This specification is not for use over
lightweight insulating concrete
decks.
Design and installation of the deck and/or roof
substrate must result in the
roof draining freely, to outlets numerous enough and so located as to remove water
promptly and completely. Areas where water ponds for more than 24 hours are unacceptable
and will not be eligible for a JM
Roofing System Guarantee.
Note: This specification is also for use
with JM PAO (Classic) products.
All general instructions contained in the current JM Commercial/Industrial Roofing Systems Manual shall be considered
part of this specification.
Flashings
Flashing details can be found in the "Bituminous
Flashings" section of the
JM Commercial/Industrial Roofing Systems Manual.
Application
Using one of the base plies listed, start with a piece 19 3 /4" (502 mm) wide. The remaining plies
are to be applied full width 3" (76 mm) side and 4" (102 mm) end laps over the
preceding sheets. Nail the laps at 9" (229 mm) centers, and down the longitudinal
center of each felt ply, place two rows of fasteners, with the rows spaced approximately
11" (279 mm) apart, and fasteners staggered on approximately 18" (457 mm)
centers. Use nails or fasteners appropriate to the type of deck, with 1" (25 mm)
minimum diameter caps. For additional fastener information, refer to the fastener data in
the "Roof Decks" section of the current JM Commercial/Industrial Roofing Systems
Manual.

Heat weld a full width piece of one of the cap sheets
listed so that it is firmly and
uniformly set. Subsequent sheets are to be applied in the same manner, with 4" (102
mm) side and 6" (152 mm) end laps over the preceding sheets. All laps must be rolled
with a 3" (76 mm) rounded edge roller. A 1/8" to 3/8" (3 mm to 10 mm)
bleedout of APP compound shall be visible at the edge of all seams. All laps must be checked for good adhesion.
Application of JM APP/PAO Modified Bitumen Products
may require the use of an open
flame propane torch. Improper use of these materials and application equipment can result
in severe burns, and/or other physical injury, as well as damage to property. In order to
prevent these situations the mechanic must install the materials using the techniques
recommended by JM and those found in "A Guide to Safety: Torch-On Modified
Bitumens" available from the Asphalt Roofing Manufacturers Association. These
techniques have been endorsed by the National Roofing Contractors Association and the
United Union of Roofers, Waterproofers
and Allied Workers.
For special precautions for heat weld application of JM
Classic (PAO) products, refer to Paragraph 7B.6.6.
For cold weather application techniques, refer to Paragraph
7B.14.
Steep Slope Requirements
Special procedures are required on inclines over 2 1 /2" per foot (208 mm/m). Refer to Paragraph 7B.12.
Surfacing
Smooth surfaced membranes must be coated with a JM approved coating. The coating chosen will depend on
aesthetics and any fire rating or
Code approval required.
Note: When using metric and English sized
sheets in the same system, care must be taken to avoid lap over lap
configurations.