architecture - engineering - construction
AECinfo.com

A  |  B  |  C  |  D  |  E  |  F  |  G  |  H  |  I  |  J  |  K  |  L  |  M  |  N  |  O  |  P  |  Q  |  R  |  S  |  T  |  U  |  V  |  W  |  X  |  Y  |  Z

 

Categories

Categories
Code Description Brochures 3-Part CSI specifications CAD details
12050 Fabric      
23 37 16 Fabric Air Distribution Devices      
12051 Fabric Fibers      
13 31 00 Fabric Structures Brochures    
12095 Fabric Treatments      
09 54 46 Fabric-Wrapped Ceiling Panels Brochures 3-Part CSI specifications CAD details
09 77 23 Fabric-Wrapped Panels      
23 32 13 Fabricated, Metal Air Plenums      
23 51 16 Fabricated Breechings and Accessories      
32 34 00 Fabricated Bridges      
13 34 23.14 Fabricated Classroom Buildings      
13 34 23.16 Fabricated Control Booths      
13 34 23.19 Fabricated Dome Structures      
13 34 00 Fabricated Engineered Structures Brochures 3-Part CSI specifications CAD details
07 44 63 Fabricated Faced Panel Assemblies Brochures 3-Part CSI specifications CAD details
05 12 16 Fabricated Fireproofed Steel Columns      
45 39 00 Fabricated Metal Product Manufacturing Equipment      
05 71 13 Fabricated Metal Spiral Stairs      
07 46 63 Fabricated Panel Assemblies with Siding Brochures 3-Part CSI specifications CAD details
32 34 13 Fabricated Pedestrian Bridges      
32 34 33 Fabricated Railway Bridges      
32 34 23 Fabricated Roadway Bridges      
07 41 63 Fabricated Roof Panel Assemblies Brochures 3-Part CSI specifications CAD details
13 26 00 Fabricated Rooms Brochures    
13 48 23 Fabricated Sound and Vibration Control Assemblies      
05715 Fabricated Spiral Stair      
23 51 19 Fabricated Stacks      
13 34 23 Fabricated Structures Brochures 3-Part CSI specifications CAD details
13 34 23.23 Fabricated Substation Control Rooms      
07 42 63 Fabricated Wall Panel Assemblies Brochures 3-Part CSI specifications CAD details
10 56 16 Fabricated Wood Storage Shelving      
01 43 19 Fabricator Qualifications      
12 05 13 Fabrics      
11 24 23 Façade Access Equipment      
05 19 13 Façade Support Truss Assemblies      
03 45 13 Faced Architectural Precast Concrete Brochures 3-Part CSI specifications CAD details
07440 Faced Panel Brochures 3-Part CSI specifications CAD details
07 44 00 Faced Panels Brochures 3-Part CSI specifications CAD details
00217 Facilities/Assets Management      
23 13 23 Facility Aboveground Fuel-Oil, Storage Tanks      
22 14 26.16 Facility Area Drains      
14 91 00 Facility Chutes      
01 94 00 Facility Decommissioning      
01900 Facility Decommissioning      
01 94 13 Facility Decommissioning Procedures      
22 05 73 Facility Drainage Manholes      
22 05 76 Facility Drainage Piping Cleanouts      
22 13 43.13 Facility Dry-Well Packaged Sewage Pumping Stations      
26 30 00 Facility Electrical Power Generating and Storing Equipment      
22 12 16 Facility Elevated, Potable-Water Storage Tanks Brochures    
01 81 16 Facility Environmental Requirements      
11 24 29 Facility Fall Protection Brochures 3-Part CSI specifications CAD details
21 11 16 Facility Fire Hydrants      
21 11 00 Facility Fire-Suppression Water-Service Piping      
23 11 00 Facility Fuel Piping Brochures    
23 12 00 Facility Fuel Pumps Brochures    
23 10 00 Facility Fuel Systems Brochures    
23 11 13 Facility Fuel-Oil Piping Brochures    
23 12 13 Facility Fuel-Oil Pumps Brochures    
23 13 00 Facility Fuel-Storage Tanks Brochures    
23 12 16 Facility Gasoline Dispensing Pumps      
23 11 16 Facility Gasoline Piping      
22 13 63 Facility Gray Water Tanks      
22 12 19 Facility Ground-Mounted, Potable-Water Storage Tanks      
22 12 23 Facility Indoor Potable-Water Storage Tanks      
26 41 00 Facility Lightning Protection Brochures    
23 11 26 Facility Liquefied-Petroleum Gas Piping Brochures    
01 93 00 Facility Maintenance      
01 93 13 Facility Maintenance Procedures      
23 11 23 Facility Natural-Gas Piping Brochures    
01 92 00 Facility Operation      
01800 Facility Operation      
01 92 13 Facility Operation Procedures      
22 13 43 Facility Packaged Sewage Pumping Stations      
01 81 00 Facility Performance Requirements      
22 12 23.26 Facility Plastic, Indoor Potable-Water Storage Non- Pressure Tanks      
22 12 23.23 Facility Plastic, Indoor Potable-Water Storage Pressure Tanks      
22 12 00 Facility Potable-Water Storage Tanks Brochures    
02 80 00 Facility Remediation      
22 12 13 Facility Roof-Mounted, Potable-Water Storage Tanks      
22 13 00 Facility Sanitary Sewerage      
22 13 13 Facility Sanitary Sewers      
22 13 53 Facility Septic Tanks      
01 31 14 Facility Services Coordination      
01 86 00 Facility Services Performance Requirements Brochures    
01 91 19 Facility Shell Commissioning      
01 83 00 Facility Shell Performance Requirements Brochures    
22 12 23.16 Facility Steel, Indoor Potable-Water Storage Non- Pressure Tanks      
22 12 23.13 Facility Steel, Indoor Potable-Water Storage Pressure Tanks      
22 14 00 Facility Storm Drainage      
22 14 13 Facility Storm Drainage Piping      
22 14 26 Facility Storm Drains      
01 91 16 Facility Substructure Commissioning      
01 82 00 Facility Substructure Performance Requirements      
22 14 26.19 Facility Trench Drains      
23 13 13 Facility Underground Fuel-Oil, Storage Tanks Brochures    
11 82 36 Facility Waste Balers      
11 82 26 Facility Waste Compactors      
11 82 33 Facility Waste Shredders      
22 11 00 Facility Water Distribution Brochures    
22 11 13 Facility Water Distribution Piping Brochures    
22 13 43.16 Facility Wet-Well Packaged Sewage Pumping Stations      
27 33 26 Facsimile Servers      
27 32 29 Facsimiles and Modems      
05080 Factory-Applied Metal Coating      
06080 Factory-Applied Wood Coating      
03 11 13.19 Falsework      
15830 Fan      
15766 Fan Coil Units      
23 82 19 Fan Coil Units      
44 32 13.13 Fan-equipped Odor Dispersing Exhaust Stacks      
07715 Fascias, Soffit Panels and Penthouse Enclosures Brochures    
22 13 19.23 Fats, Oils, and Grease Disposal Systems      
09 94 16 Faux Finishing Brochures    
01609 Feasibility Studies      
14570 Feeder Equipment      
41 13 23 Feeders      
15520 Feedwater Equipment      
01 41 23 Fees      
02825 Fences, Gates & Hardware Brochures 3-Part CSI specifications CAD details
02820 Fences and Gate Brochures 3-Part CSI specifications CAD details
32 31 00 Fences and Gates Brochures 3-Part CSI specifications CAD details
43 41 13.13 Ferrous Gas and Liquid Pressure Vessels      
42 14 33.16 Ferrous Melting Furnaces      
05062 Ferrous Metals & Alloys      
44 53 43 Ferrous Metals Separation Equipment      
32 01 90.13 Fertilizing      
16565 Fiber Optic      
16555 Fiber Optic Lighting      
40 95 33.23 Fiber Optic Process Control Networks      
31 34 23 Fiber Soil Reinforcement      
07 46 46 Fiber-Cement Siding Brochures    
32 12 16.26 Fiber-Modified Asphalt Paving      
07450 Fiber-Reinforced Cementitious Panel Brochures 3-Part CSI specifications CAD details
06162 Fiberboard Sheets      
09 28 19 Fibered Gypsum Backing Boards Brochures    
08 16 13 Fiberglass Doors Brochures 3-Part CSI specifications CAD details
43 41 13.19 Fiberglass Gas and Liquid Pressure Vessels      
06 74 13 Fiberglass Reinforced Gratings      
09 54 53 Fiberglass Reinforced Panel Ceilings Brochures 3-Part CSI specifications CAD details
06 83 16 Fiberglass Reinforced Paneling      
08 54 69 Fiberglass Storm Windows Brochures    
34 11 39.13 Fiberglass Track Collector Pans      
08 54 66 Fiberglass Window Screens Brochures    
08 54 13 Fiberglass Windows      
07 31 13.13 Fiberglass-Reinforced Asphalt Shingles Brochures    
40 05 13.76 Fiberglass-Reinforced Plastic and Resins Process Piping      
08 45 23 Fiberglass-Sandwich-Panel Assemblies Brochures 3-Part CSI specifications CAD details
07 21 13.16 Fibrous Board Insulation Brochures 3-Part CSI specifications CAD details
03 24 00 Fibrous Reinforcing Brochures 3-Part CSI specifications CAD details
03240 Fibrous Reinforcing Brochures 3-Part CSI specifications CAD details
23 31 16.13 Fibrous-Glass Ducts      
01 71 23 Field Engineering      
01522 Field Offices & Sheds      
01 52 13 Field Offices and Sheds      
00 63 36 Field Order Form      
01 26 39 Field Orders      
01 45 16 Field Quality Control Procedures      
01 43 36 Field Samples      
32 18 23.23 Field Sport Surfacing      
01 33 19 Field Test Reporting      
15650 Field-Erected Cooling Tower      
23 65 23 Field-Erected Cooling Towers      
32 13 73.16 Field-Molded Concrete Paving Joint Sealants      
08 34 58 File Room Doors and Frames Brochures 3-Part CSI specifications CAD details
12 51 19 Filing Cabinets      
31 23 23 Fill      
41 34 23.19 Film Coating Equipment      
11 27 16 Film Transfer Cabinets      
46 61 17 Filter Air Scour Equipment      
46 61 13 Filter Media      
11360 Filter Press Equipment      
46 61 16 Filter Surface Wash Agitators      
13220 Filter Underdrains and Media      
46 61 00 Filtration Equipment      
01 74 23 Final Cleaning      
01 77 16 Final Closeout Review      
00 65 19.26 Final Settlement Certificate Form      
01 78 29 Final Site Survey      
00214 Financial Management & Cost Accounting      
31 22 16 Fine Grading      
06 20 00 Finish Carpentry Brochures 3-Part CSI specifications CAD details
06200 Finish Carpentry Brochures 3-Part CSI specifications CAD details
06 01 20.92 Finish Carpentry Preservation      
06 01 20.71 Finish Carpentry Rehabilitation Brochures    
06 01 20.91 Finish Carpentry Restoration      
31 22 19 Finish Grading      
09 Finishes Brochures 3-Part CSI specifications CAD details
09 - 16 Div. Finishes Brochures 3-Part CSI specifications CAD details
11 23 19 Finishing Equipment      
41 34 00 Finishing Equipment      
41 31 13.39 Finishing/Painting Lines      
23 52 33.13 Finned Water-Tube Boilers      
23 82 36 Finned-Tube Radiation Heaters      
28 05 13.23 Fire Alarm Communications Conductors and Cables      
28 31 53.33 Fire Alarm Flow Switches      
28 31 63.13 Fire Alarm Horns and Strobes      
28 31 53 Fire Alarm Initiating Devices      
28 31 63 Fire Alarm Integrated Audio Visual Evacuation Systems      
28 31 53.23 Fire Alarm Level Detectors Switches      
28 31 53.43 Fire Alarm Pressure Sensors      
28 31 53.13 Fire Alarm Pull Stations      
01675 Fire and Life Safety Engineers      
07 80 00 Fire and Smoke Protection      
07800 Fire and Smoke Protection      
23 33 13.16 Fire Dampers      
10 41 13 Fire Department Plan Cabinets      
28 31 00 Fire Detection and Alarm Brochures 3-Part CSI specifications CAD details
28 31 23 Fire Detection and Alarm Annunciation Panels and Fire Stations      
28 31 13 Fire Detection and Alarm Control, GUI, and Logic Systems      
28 31 33 Fire Detection and Alarm Interfaces      
28 31 33.16 Fire Detection and Alarm Interfaces to Access Control Hardware      
28 31 33.23 Fire Detection and Alarm Interfaces to Access Control System      
28 31 33.43 Fire Detection and Alarm Interfaces to Elevator Control      
28 31 33.26 Fire Detection and Alarm Interfaces to Intrusion Detection      
28 31 33.13 Fire Detection and Alarm Interfaces to Remote Monitoring      
28 31 33.33 Fire Detection and Alarm Interfaces to Video Surveillance      
28 31 43 Fire Detection Sensors      
10 44 43 Fire Extinguisher Accessories Brochures 3-Part CSI specifications CAD details
10 44 16 Fire Extinguishers Brochures 3-Part CSI specifications CAD details
13910 Fire Protection Basic Materials and Method      
10 44 13 Fire Protection Cabinets Brochures 3-Part CSI specifications CAD details
15300 Fire Protection Piping      
10 44 00 Fire Protection Specialties Brochures 3-Part CSI specifications CAD details
10520 Fire Protection Specialties Brochures 3-Part CSI specifications CAD details
13920 Fire Pump      
21 30 00 Fire Pumps      
08588 Fire Rated Windows Brochures 3-Part CSI specifications CAD details
09966 Fire Resistant Paints      
13900 Fire Suppression Brochures 3-Part CSI specifications CAD details
21 Fire Suppression Brochures 3-Part CSI specifications CAD details
01 86 13 Fire Suppression Performance Requirements      
21 07 00 Fire Suppression Systems Insulation Brochures    
33 11 19 Fire Suppression Utility Water Distribution Piping      
02515 Fire Water System & Accessories      
21 11 19 Fire-Department Connections      
21 20 00 Fire-Extinguishing Systems      
33 47 19.33 Fire-Protection Water Ponds      
08455 Fire-Rated Glazed Wall/Door Assemblies      
08 88 13 Fire-Resistant Glazing      
08726 Fire-Retardant & Intumescent Door Seals      
09 96 43 Fire-Retardant Coatings Brochures 3-Part CSI specifications CAD details
06072 Fire-retardant Treated Wood Products      
06 05 73.13 Fire-Retardant Wood Treatment      
21 07 16 Fire-Suppression Equipment Insulation Brochures    
21 12 19 Fire-Suppression Hose Racks      
21 12 16 Fire-Suppression Hose Reels      
21 12 23 Fire-Suppression Hose Valves      
21 12 13 Fire-Suppression Hoses and Nozzles      
21 07 19 Fire-Suppression Piping Insulation Brochures    
21 16 00 Fire-Suppression Pressure Maintenance Pumps      
21 13 00 Fire-Suppression Sprinkler Systems      
21 12 00 Fire-Suppression Standpipes      
21 40 00 Fire-Suppression Water Storage      
23 52 39 Fire-Tube Boilers      
10330 Fireplace and Stove Restoration      
10 32 13 Fireplace Dampers Brochures    
10 32 23 Fireplace Doors Brochures    
10 32 16 Fireplace Inserts Brochures    
10 32 19 Fireplace Screens Brochures    
10 32 00 Fireplace Specialties Brochures    
10310 Fireplace Specialties and Accessories Brochures    
10 32 26 Fireplace Water Heaters Brochures    
10300 Fireplaces and Stove      
10 30 00 Fireplaces and Stoves      
09 23 82 Fireproof Gypsum Plastering Brochures    
07 06 80.13 Fireproofing Schedule      
07 84 00 Firestopping Brochures    
07840 Firestopping Brochures    
07 06 80.16 Firestopping Schedule      
10 43 16 First Aid Cabinets      
01 52 16 First Aid Facilities      
35 79 13 Fish Ladders      
11484 Fitness Training Equipment      
15411 Fittings, Trim and Accessories      
34 77 13.13 Fixed Aircraft Passenger Loading Bridges      
12 61 00 Fixed Audience Seating      
12610 Fixed Audience Seating      
44 13 34 Fixed Bed Adsorption Equipment      
44 13 93 Fixed Bed Biofilter Equipment      
44 13 97 Fixed Bed Bioscrubbing Equipment      
44 13 96 Fixed Bed Biotrickling Filter Equipment      
41 52 13.13 Fixed Bins and Hoppers      
10 11 13.13 Fixed Chalkboards      
31 63 26.13 Fixed End Caisson Piles      
14610 Fixed Hoist      
41 22 23.13 Fixed Hoists      
08 91 19 Fixed Louvers Brochures 3-Part CSI specifications CAD details
10 11 16.13 Fixed Markerboards      
46 51 11 Fixed Mechanical Aerators      
44 21 13 Fixed Noise Abatement Barriers      
11 52 13.13 Fixed Projection Screens Brochures    
09 84 13 Fixed Sound-Absorptive Panels Brochures 3-Part CSI specifications CAD details
09 84 16 Fixed Sound-Reflective Panels Brochures    
10 71 13.43 Fixed Sun Screens Brochures 3-Part CSI specifications CAD details
10 11 23.13 Fixed Tackboards      
34 71 19.13 Fixed Vehicle Delineators      
23 72 19 Fixed-Plate Air-to-Air Energy-Recovery Equipment      
41 36 16 Fixtures and Jigs      
10350 Flagpole